Where: Velocity → Story Point Distribution.
- Every estimate is reported. There is no longer a minimum number of tasks before an estimate shows its median time, Cost / SP and suggested weight, and the setting is gone from the card's gear. The Tasks column beside each row shows how much history a figure rests on: one built on two or three tasks is a single example, not a pattern. People who see only their own teams still need ten tasks per estimate, because the card is company-wide and a smaller sample would show individual people's time outside their teams.
- Days, not 47 hours. Median times of a day or more are shown in days (for example 2 d instead of 47.4 h), on this card and on the Time Tracking cards that share it.
- A shorter note under the table: where the numbers come from, what Cost / SP is, and what one weighted point equals.